Mogema: Process Knowledge Secured with an Interim Consultant For years, Mogema had accumulated process knowledge that was not documented anywhere. Internally, there was insufficient capacity to address this. Symbol provided an interim consultant who conducted interviews in the factory and converted knowledge into structured work instructions. Result: ongoing projects fully documented at the same level as new projects.
MOSO: 30% shorter lead time through process improvement MOSO's R&D department was overloaded and a barrier to growth. Not due to a lack of talent, but because of a lack of structure and unclear ownership. Symbol provided the diagnosis and a targeted approach. Result: 30% shorter lead time and, for the first time in years, room for new product development.
Tata Steel: Six Sigma Implementation Saved Over €50M Tata Steel systematically pursues operational excellence through data-driven Six Sigma projects. Symbol provides Green and Black Belt training and coaches projects where capacity is lacking. Result: one project involving iron mixers yields over €200,000 per year. Five seconds of time saving per steel coil means tens of thousands of euros in savings.
Thales: Lean transformation of radar production Lean transformation within 22 departments resulted in a 30% shorter lead time and less work in progress. Symbol implemented Lean fundamentals consisting of 6S, WIP control and visual management across 22 departments.