MOSO: 30% shorter lead time through process improvement MOSO's R&D department was overloaded and a barrier to growth. Not due to a lack of talent, but because of a lack of structure and unclear ownership. Symbol provided the diagnosis and a targeted approach. Result: 30% shorter lead time and, for the first time in years, room for new product development.
GGD: vaccination speed increased based on Lean GGD GHOR had to triple the vaccination rate in a short period of time. Symbol formed a Lean team of five consultants who visited 50 vaccination locations in 6 weeks and implemented targeted improvements. Result: the vaccination rate rose from 22 to 100 jabs per hour per line and the weekly volume grew from 500,000 to 1.4 million jabs.
REINÆRDT: lead time from 3 weeks to 1 week in 4 months REINAERDT Deuren wanted to reduce lead time from 3 weeks to 1 week. Internal Lean knowledge was present, but the change did not get off the ground. Symbol guided nine sub-projects via Value Stream Mapping. Result: goal achieved in 4 months, buffer halved, and 5,000 doors delivered per week as the fastest supplier in the Netherlands.
ZGT: Continuous Improvement Across 50 Departments with Lean Six Sigma ZGT is building a culture of continuous improvement: improvement teams in every department, two project weeks per year, and trained Green Belts. Symbol guides the process. Result: 22 active improvement teams, a 75% success rate for the Green Belt, and a snowball effect of improvements throughout the organisation.