MOSO: 30% shorter lead time through process improvement MOSO's R&D department was overloaded and a barrier to growth. Not due to a lack of talent, but because of a lack of structure and unclear ownership. Symbol provided the diagnosis and a targeted approach. Result: 30% shorter lead time and, for the first time in years, room for new product development.
REINÆRDT: lead time from 3 weeks to 1 week in 4 months REINAERDT Deuren wanted to reduce lead time from 3 weeks to 1 week. Internal Lean knowledge was present, but the change did not get off the ground. Symbol guided nine sub-projects via Value Stream Mapping. Result: goal achieved in 4 months, buffer halved, and 5,000 doors delivered per week as the fastest supplier in the Netherlands.
ZGT: Continuous Improvement Across 50 Departments with Lean Six Sigma ZGT is building a culture of continuous improvement: improvement teams in every department, two project weeks per year, and trained Green Belts. Symbol guides the process. Result: 22 active improvement teams, a 75% success rate for the Green Belt, and a snowball effect of improvements throughout the organisation.
GGD: vaccinatiesnelheid verhoogd o.b.v. Lean GGD GHOR moest het vaccinatietempo in korte tijd verdrievoudigen. Symbol formeerde een Lean-team van vijf consultants dat in 6 weken 50 vaccinatielocaties bezocht en gerichte verbeteringen doorvoerde. Resultaat: het priktempo steeg van 22 naar 100 prikken per uur per priklijn en het weekvolume groeide van 500.000 naar 1,4 miljoen prikken.