Tata Steel: Six Sigma Implementation Saved Over €50M Tata Steel systematically pursues operational excellence through data-driven Six Sigma projects. Symbol provides Green and Black Belt training and coaches projects where capacity is lacking. Result: one project involving iron mixers yields over €200,000 per year. Five seconds of time saving per steel coil means tens of thousands of euros in savings.
Veco Precision: inspection system improved with data analysis Veco Precision's automated inspection system collected a lot of data but provided unreliable results. Symbol data scientist analysed 300 photos per product, identified the relevant parameters and implemented a software upgrade. Result: consistent and reliable measurement system with 20 parameters instead of 3, ready for rollout to other products.
REINÆRDT: lead time from 3 weeks to 1 week in 4 months REINAERDT Deuren wanted to reduce lead time from 3 weeks to 1 week. Internal Lean knowledge was present, but the change did not get off the ground. Symbol guided nine sub-projects via Value Stream Mapping. Result: goal achieved in 4 months, buffer halved, and 5,000 doors delivered per week as the fastest supplier in the Netherlands.